Dholera Project Status 2025: Completion Date, Cost, & Progress

The question every investor asks is: “Is the Dholera Smart City Project real?”

Based on the latest government reports and on-ground audits in December 2025, the answer is a definitive Yes. Dholera has moved past the planning stage and is now in its final construction phase. Infrastructure is complete, and major companies are moving in.

This page provides the latest verified Dholera Completion Date timelines and quantifiable Dholera Phase 1 Progress updates.

What is the Dholera Project?

The┬аdholera sir projects is a flagship initiative by the Government of India to develop a futuristic city spanning┬а920 square kilometers. It is part of the DMIC program and focuses on industrial growth, modern urban living, and renewable energy. The project aims to attract global investors, create job opportunities, and set a benchmark for sustainable urban development.

Executive Summary: Why the Project is Real Now

Dholera’s progress is validated by two key facts: the completion of essential utilities and the commitment of $1.18$ Lakh Crore from private corporations like the Tata Group.

InfrastructureStatus (Verified December 2025)Investment Impact
Dholera ExpresswayNearing full completion ($\text{98\%}$ done); unofficially open for use.Cuts Ahmedabad travel time to $\text{40-50 minutes}$, boosting land value.
Dholera International AirportConstruction confirmed to be completed by December 2025.Opens Dholera to international trade and cargo operations.
Tata Semiconductor PlantConstruction for India’s first government-approved chip fab is underway.Secures Dholera as a high-tech industrial hub.
Phase 1 UtilitiesRoads, electricity, water treatment, and underground utility services in the Activation Area (TP2) are 100% complete.Allows industries and residents to move in immediately.

Project Completion Audit: Status of Core Infrastructure

A. Roads, Water, and Utilities (The Foundation)

The most important part of Phase 1 is making sure the core services work. This part of the Dholera Smart City Project Status is complete:

  • Roads & Services (TP2): All utility work, including smart roads, water supply lines, and data cables, is finished in the 22.5 sq. km. Activation Area. This means plots here are ready to use.
  • Water Supply: The main water treatment plants and the water supply network are fully operational, guaranteeing $24 \times 7$ water.
  • Power: The city has a secure and sustainable power supply, including access to the nearby Dholera Solar Park.

B. Connectivity Timeline: Airport and Expressway

These large-scale projects are the biggest sign of government commitment and future growth.

1. Dholera International Airport Construction Status

The Ministry of Civil Aviation has confirmed the airport will be ready by December 2025. There are no reports of major delays.

  • Progress: Construction is currently focused on the main runway (3,200 meters long) and the integrated terminal building.
  • Impact: The airport will serve as a major cargo and passenger hub, relieving pressure on Ahmedabad Airport.
2. Ahmedabad-Dholera Expressway Status

This six-lane corridor is the lifeline connecting Dholera to the rest of Gujarat.

  • Current Progress: The expressway is complete. Final touches like lane markings and structural joints are ongoing.
  • Benefit: Once officially opened, the 40-45 minute drive time will make Dholera a practical investment location for residents of Ahmedabad and Mumbai.

Anchor Investments: Companies Driving the Project

The companies setting up their facilities are proof that the Dholera Project is no longer just a plan.

Tata Electronics: The Semiconductor Hub

  • Project: Tata is setting up India’s first government-approved chip fabrication unit (Fab) in Dholera.
  • Investment: A massive $\text{Rs 1.18}$ lakh crore commitment, including a partnership with US giant Intel Corporation.
  • Impact on Land: This creates immediate, high-value demand for Dholera industrial plots and residential land nearby, as thousands of skilled workers will be needed.

Other Key Industries

  • Solar Power: Companies like ReNew Power are operating manufacturing plants in Dholera, strengthening the city’s green energy status.
  • Manufacturing: Other major groups like Polycab India (cables/wires) and HPCL (logistics) are also investing heavily, showing faith in Dholera’s infrastructure.
  1. What is the final official completion date for Dholera Smart City Phase 1?

    The primary Dholera Phase 1 completion date for the core Activation Area infrastructure (TP2 roads, water, and utilities) is 100% complete. Key connectivity projects like the Dholera International Airport are officially confirmed to be ready by December 2025.

  2. What is the total project cost of Dholera and is the government still funding it?

    The estimated cost for Dholera SIR infrastructure is in the thousands of crores (approx. тВ╣3,000 Crore for initial Phase 1 infrastructure). The project has continuous government backing and significant private investment (including the тВ╣91,000 Crore Tata Semiconductor project), confirming its financial stability.

  3. How can I verify the current status of Dholera construction before investing?

    You should check real-time construction photos (like those on our site), confirm the Expressway Status (currently complete), and verify the status of TP Schemes (like TP2). The best verification is confirming the 100% completion of underground utilities in the Activation Area.