Dholera TP Schemes (2026): TP1 to TP6, Sub-TPs & Planning

Home / Dholera TP Schemes
Town Planning Framework • TP1 to TP6

Dholera TP Schemes (2026): TP1 to TP6, 27 Sub-TPs & Planning Guide

Dholera Special Investment Region (DSIR) is organized through a statutory Dholera Town Planning scheme framework rather than unplanned urban sprawl. Across the ~920 sq. km. Dholera SIR boundary, approximately 422 sq. km. is structured into 6 major Dholera TP schemes (Dholera TP1 to TP6) and 27 Dholera sub-TP schemes.

Dholera SIR (~920 sq. km.) → TP1–TP6 (~422 sq. km.) → 27 Sub-TPs → Survey No. → Final Plot (FP)
Dholera SIR TP Structure

Town Planning Framework at a Glance

6 SchemesDholera TP 1 to TP 6
27 Sub-TPsSmaller planning units
~422 sq. km.Total TP scheme area
TP2A & TP4AActivation Area core
Knowing a plot’s TP number is only step one—always verify its Sub-TP, land-use zone, Final Plot (FP), and 7/12 title separately.
Planning Structure

What Is a Dholera SIR TP Scheme?

A Town Planning (TP) scheme reconstitutes fragmented agricultural survey numbers into organized urban parcels with dedicated arterial roads, trunk utilities, residential pockets, industrial zones, and public amenities.

Planning ParameterOfficial StructureBuyer & Research Significance
Notified Dholera SIR Area~920 sq. km. (22 villages)Confirms whether land sits inside the notified SIR boundary
Developable TP Scheme Area~422 sq. km.Covered under statutory Town Planning reconstitution
Major Dholera TP Schemes6 Schemes (TP 1, TP 2, TP 3, TP 4, TP 5, TP 6)Defines broad development phase and corridor positioning
Dholera Sub-TP Schemes27 Sub-TP Schemes (e.g., TP1A, TP2A, TP4A)Smaller administrative pockets created for faster finalisation
Initial Activation Area (~22.54 sq. km.)Associated with TP-2A and TP-4APriority Phase-1 zone where trunk infrastructure was executed first
Scheme-by-Scheme Breakdown

Dholera TP1 to TP6: Complete Overview

Each Dholera TP scheme serves a distinct role in the phased rollout of Dholera SIR. Never evaluate a TP scheme as a single uniform price or readiness zone.

Phase 1 • ~51 sq. km.

Dholera TP 1 (TP-1)

Part of the initial Phase-1 planning framework, featuring planned arterial roads, residential pockets, industrial zones, and utility corridors.

  • Subdivided into TP-1A and TP-1B pockets
  • Bordered by active outside-SIR plotted developments
  • Check exact zoning and road status per survey number
Phase 1 • ~102 sq. km. • Activation Core

Dholera TP 2 (TP-2)

The largest Phase-1 Town Planning scheme. Its sub-scheme TP-2A forms a primary core of the 22.54 sq. km. Activation Area.

  • Includes TP-2A, TP-2B-1, TP-2B-2, and TP-2B-3
  • Strong industrial, trunk utility, and manufacturing focus
  • Note: TP-2 as a whole is much larger than the Activation Area
Phase 2 • Expansion Belt

Dholera TP 3 (TP-3)

Part of the second broad development phase, planned for structured urban and supporting expansion beyond the initial Phase-1 core.

  • Includes TP-3A and TP-3B sub-schemes
  • Evaluated for medium-to-long-term corridor growth
  • Verify Sub-TP finalisation and physical road access
Phase 2 • Activation Link (TP-4A)

Dholera TP 4 (TP-4)

Part of Phase-2 planning, with TP-4A directly linked to the initial Activation Area and trunk infrastructure rollout.

  • Includes TP-4A, TP-4B-1, and TP-4B-2 sub-schemes
  • TP-2A and TP-4A were among the earliest sanctioned schemes
  • Distinguish TP-4A from wider TP-4B pockets
Phase 3 • Future Expansion

Dholera TP 5 (TP-5)

Part of the third planning phase, planned for high-tech, electronics, and future urban expansion within Dholera SIR.

  • Includes TP-5A and TP-5B sub-schemes
  • Represents longer-horizon development timelines
  • Verify exact survey number, FP status, and approach road
Phase 3 • Long-Term Horizon

Dholera TP 6 (TP-6)

The sixth major Town Planning scheme under Phase-3 expansion, supporting logistics, green energy, and future city growth.

  • Includes TP-6A and adjoining sub-schemes
  • Requires long-term holding perspective
  • Always check land use and TP finalisation stage
Key Investor Distinction: Being in TP-2 or TP-4 does not automatically mean a plot sits inside the 22.54 sq. km. Activation Area—only specific pockets (such as TP-2A and TP-4A) form the Activation Area. Read our Activation Area Guide →
Phased Rollout

27 Sub-TP Schemes & 3 Development Phases

Because each major TP scheme spans tens of square kilometres, planning authorities divided the 6 TP schemes into 27 smaller Sub-TP schemes to streamline sanctioning, reconstitution, and infrastructure delivery.

3 Broad Planning Phases

Dholera SIR development is structured across three sequential phases:

  • Phase 1: Dholera TP 1 + Dholera TP 2 (initial core & TP-2A Activation Area)
  • Phase 2: Dholera TP 3 + Dholera TP 4 (includes TP-4A Activation link)
  • Phase 3: Dholera TP 5 + Dholera TP 6 (long-term city expansion)

Why 27 Sub-TP Schemes Matter

Sub-TPs (such as TP-1A, TP-2A, TP-2B-1, TP-4A, TP-4B-1, TP-5A, and TP-6A) can be at different stages—draft, preliminary, or sanctioned/finalised. Compare Draft vs Preliminary TP schemes in Dholera → and check official Dholera TP Map Links →

Terminology Guide

Original Plot vs Final Plot in Dholera TP Schemes

Understanding Original Plot vs Final Plot in Dholera prevents confusion when reading Town Planning records and sale documents. See our guide on how to verify a Final Plot in Dholera →

Revenue Record

Survey / Block No.

The original agricultural/revenue parcel number recorded on AnyRoR 7/12 Utara.

Pre-Reconstitution

Original Plot (OP)

The parcel boundary recognized before Town Planning road and amenity deductions.

Post-Reconstitution

Final Plot (FP)

The reshaped, road-accessible plot allotted back to the owner under the sanctioned TP scheme.

Zoning Layer

Land-Use Zone

Defines permitted activity (Residential, Commercial, Industrial, Public Facility, etc.).

Verification Sequence

How to Verify a Plot’s Dholera TP Scheme

Follow these 6 steps before relying on any brochure claim. For detailed map-reading instructions, read How to Read a Dholera TP Map → or follow our Final Plot Verification Guide →.

  1. Obtain Revenue Village & Survey Number. Get the exact village and survey/block number from the seller.
  2. Confirm Inside-SIR Boundary Status. Verify whether the survey number sits inside the ~920 sq. km. Dholera SIR.
  3. Identify TP & Sub-TP Scheme. Match the survey number against official TP1–TP6 and Sub-TP records.
  4. Check Original Plot (OP) & Final Plot (FP). Confirm reconstituted FP number, net area after deduction, and road frontage.
  5. Verify Sanctioned Land-Use Zoning. Confirm residential, commercial, or industrial zoning compliance.
  6. Audit 7/12 Title & Approvals. Complete independent legal verification of ownership, NA/NOC, and RERA status.
Common Questions

Dholera TP Schemes FAQ

Clear answers on TP1–TP6, 27 sub-TP schemes, OP vs FP, and planning checks.

How many TP schemes are there in Dholera SIR?
Dholera SIR is divided into 6 major Town Planning schemes (TP1 to TP6) and 27 Sub-Town Planning schemes covering approximately 422 sq. km. within the ~920 sq. km. notified SIR. See our Draft vs Preliminary TP schemes guide for sanction stage details.
Which Dholera TP schemes cover the Activation Area?
The ~22.54 sq. km. initial Activation Area is primarily associated with TP-2A (under TP-2) and TP-4A (under TP-4), where trunk infrastructure was prioritized first.
What is the difference between Original Plot (OP) and Final Plot (FP) in Dholera?
An Original Plot (OP) reflects the original survey parcel before Town Planning deductions, whereas a Final Plot (FP) is the reconstituted, road-aligned plot allotted under the sanctioned TP scheme.
Does being inside a Dholera TP scheme guarantee immediate construction approval?
No. TP scheme inclusion establishes planning framework context; actual development requires sanctioned Final Plot status, matching land-use zoning, clear 7/12 title, and applicable building/development permissions.

Want to Check Which TP Scheme Applies to a Survey Number?

Share the revenue village and survey/block number to verify SIR boundary, TP/Sub-TP scheme, and land-use context.

WhatsApp Call Now Contact

Quick Inquiry

Get Verified Rates & Plot Availability

Your inquiry will open directly in WhatsApp.