Dholera TP Schemes (2026): TP1 to TP6, 27 Sub-TPs & Planning Guide
Dholera Special Investment Region (DSIR) is organized through a statutory Dholera Town Planning scheme framework rather than unplanned urban sprawl. Across the ~920 sq. km. Dholera SIR boundary, approximately 422 sq. km. is structured into 6 major Dholera TP schemes (Dholera TP1 to TP6) and 27 Dholera sub-TP schemes.
Town Planning Framework at a Glance
What Is a Dholera SIR TP Scheme?
A Town Planning (TP) scheme reconstitutes fragmented agricultural survey numbers into organized urban parcels with dedicated arterial roads, trunk utilities, residential pockets, industrial zones, and public amenities.
| Planning Parameter | Official Structure | Buyer & Research Significance |
|---|---|---|
| Notified Dholera SIR Area | ~920 sq. km. (22 villages) | Confirms whether land sits inside the notified SIR boundary |
| Developable TP Scheme Area | ~422 sq. km. | Covered under statutory Town Planning reconstitution |
| Major Dholera TP Schemes | 6 Schemes (TP 1, TP 2, TP 3, TP 4, TP 5, TP 6) | Defines broad development phase and corridor positioning |
| Dholera Sub-TP Schemes | 27 Sub-TP Schemes (e.g., TP1A, TP2A, TP4A) | Smaller administrative pockets created for faster finalisation |
| Initial Activation Area (~22.54 sq. km.) | Associated with TP-2A and TP-4A | Priority Phase-1 zone where trunk infrastructure was executed first |
Dholera TP1 to TP6: Complete Overview
Each Dholera TP scheme serves a distinct role in the phased rollout of Dholera SIR. Never evaluate a TP scheme as a single uniform price or readiness zone.
Dholera TP 1 (TP-1)
Part of the initial Phase-1 planning framework, featuring planned arterial roads, residential pockets, industrial zones, and utility corridors.
- Subdivided into TP-1A and TP-1B pockets
- Bordered by active outside-SIR plotted developments
- Check exact zoning and road status per survey number
Dholera TP 2 (TP-2)
The largest Phase-1 Town Planning scheme. Its sub-scheme TP-2A forms a primary core of the 22.54 sq. km. Activation Area.
- Includes TP-2A, TP-2B-1, TP-2B-2, and TP-2B-3
- Strong industrial, trunk utility, and manufacturing focus
- Note: TP-2 as a whole is much larger than the Activation Area
Dholera TP 3 (TP-3)
Part of the second broad development phase, planned for structured urban and supporting expansion beyond the initial Phase-1 core.
- Includes TP-3A and TP-3B sub-schemes
- Evaluated for medium-to-long-term corridor growth
- Verify Sub-TP finalisation and physical road access
Dholera TP 4 (TP-4)
Part of Phase-2 planning, with TP-4A directly linked to the initial Activation Area and trunk infrastructure rollout.
- Includes TP-4A, TP-4B-1, and TP-4B-2 sub-schemes
- TP-2A and TP-4A were among the earliest sanctioned schemes
- Distinguish TP-4A from wider TP-4B pockets
Dholera TP 5 (TP-5)
Part of the third planning phase, planned for high-tech, electronics, and future urban expansion within Dholera SIR.
- Includes TP-5A and TP-5B sub-schemes
- Represents longer-horizon development timelines
- Verify exact survey number, FP status, and approach road
Dholera TP 6 (TP-6)
The sixth major Town Planning scheme under Phase-3 expansion, supporting logistics, green energy, and future city growth.
- Includes TP-6A and adjoining sub-schemes
- Requires long-term holding perspective
- Always check land use and TP finalisation stage
27 Sub-TP Schemes & 3 Development Phases
Because each major TP scheme spans tens of square kilometres, planning authorities divided the 6 TP schemes into 27 smaller Sub-TP schemes to streamline sanctioning, reconstitution, and infrastructure delivery.
3 Broad Planning Phases
Dholera SIR development is structured across three sequential phases:
- Phase 1: Dholera TP 1 + Dholera TP 2 (initial core & TP-2A Activation Area)
- Phase 2: Dholera TP 3 + Dholera TP 4 (includes TP-4A Activation link)
- Phase 3: Dholera TP 5 + Dholera TP 6 (long-term city expansion)
Why 27 Sub-TP Schemes Matter
Sub-TPs (such as TP-1A, TP-2A, TP-2B-1, TP-4A, TP-4B-1, TP-5A, and TP-6A) can be at different stages—draft, preliminary, or sanctioned/finalised. Compare Draft vs Preliminary TP schemes in Dholera → and check official Dholera TP Map Links →
Original Plot vs Final Plot in Dholera TP Schemes
Understanding Original Plot vs Final Plot in Dholera prevents confusion when reading Town Planning records and sale documents. See our guide on how to verify a Final Plot in Dholera →
Survey / Block No.
The original agricultural/revenue parcel number recorded on AnyRoR 7/12 Utara.
Original Plot (OP)
The parcel boundary recognized before Town Planning road and amenity deductions.
Final Plot (FP)
The reshaped, road-accessible plot allotted back to the owner under the sanctioned TP scheme.
Land-Use Zone
Defines permitted activity (Residential, Commercial, Industrial, Public Facility, etc.).
How to Verify a Plot’s Dholera TP Scheme
Follow these 6 steps before relying on any brochure claim. For detailed map-reading instructions, read How to Read a Dholera TP Map → or follow our Final Plot Verification Guide →.
- Obtain Revenue Village & Survey Number. Get the exact village and survey/block number from the seller.
- Confirm Inside-SIR Boundary Status. Verify whether the survey number sits inside the ~920 sq. km. Dholera SIR.
- Identify TP & Sub-TP Scheme. Match the survey number against official TP1–TP6 and Sub-TP records.
- Check Original Plot (OP) & Final Plot (FP). Confirm reconstituted FP number, net area after deduction, and road frontage.
- Verify Sanctioned Land-Use Zoning. Confirm residential, commercial, or industrial zoning compliance.
- Audit 7/12 Title & Approvals. Complete independent legal verification of ownership, NA/NOC, and RERA status.
Dholera TP Schemes FAQ
Clear answers on TP1–TP6, 27 sub-TP schemes, OP vs FP, and planning checks.
How many TP schemes are there in Dholera SIR?
Which Dholera TP schemes cover the Activation Area?
What is the difference between Original Plot (OP) and Final Plot (FP) in Dholera?
Does being inside a Dholera TP scheme guarantee immediate construction approval?
View city maps, 22 villages, and official TP1–TP6 map links.
Map Reading How to Read a Dholera TP MapLearn how to interpret OP, FP, roads, and color codes.
Zoning Dholera Land Use & ZonesUnderstand residential, commercial, and industrial zone rules.
Want to Check Which TP Scheme Applies to a Survey Number?
Share the revenue village and survey/block number to verify SIR boundary, TP/Sub-TP scheme, and land-use context.