Draft vs Preliminary TP Schemes in Dholera SIR (27 Sub-TPs)

Research & Field Review: Shivrajsinh Chudasama (Kadipur, Dholera SIR) Updated: November 2026 Statutory Framework: Gujarat TP & UD Act / DSIRDA

When buyers inspect a Dholera Town Planning (TP) Map, almost every map displays Final Plot (FP) numbers, road widths, and zoning colours. However, what most sellers fail to mention is which statutory sanction stage that specific Sub-TP scheme has reached.

Across Dholera SIR’s ~422 sq. km. urbanisable area, the 6 Town Planning Schemes (TP1 to TP6) are divided into 27 Sub-TPs. Understanding the difference between a Draft TP Scheme and a Preliminary TP Scheme is critical—because it determines whether your Final Plot’s shape, location, and road frontage are legally fixed or still subject to adjustment.

Quick Technical Summary Draft vs Preliminary TP Scheme in Dholera SIR: Core Difference
  • Draft TP Scheme (Tentative FP Layout): Initial planning layout prepared by DSIRDA. Final Plot numbers and boundaries shown on a Draft TP map are proposed—they can shift, resize, or change road orientation during Town Planning Officer (TPO) hearings before Preliminary sanction.
  • Preliminary TP Scheme (Legally Fixed FP Boundaries): Once the Town Planning Officer completes landowner hearings, reconstitution, and F-Form allotment and the Gujarat government sanctions the Preliminary TP, physical Final Plot boundaries, net area, and road access become legally binding.
  • Final TP Scheme (Financial Settlement): The third stage where incremental contribution / betterment charges and compensation figures are finalized.
Total Planning Structure 27 Sub-TPs Spread across 6 Town Planning Schemes (TP1 to TP6) covering ~422 sq. km.
Reconstitution Sanctioned 13 Preliminary Sub-TPs where TPO reconstitution is sanctioned and physical FP boundaries are fixed.
Phased Hearing Stage 14 Draft Sub-TPs progressing through TPO hearings & reconstitution toward Preliminary sanction.

Draft vs Preliminary vs Final TP Scheme: Side-by-Side Comparison

Under the Gujarat Town Planning and Urban Development Act, every Town Planning scheme moves through three statutory milestones. Here is how each stage impacts a land or plot buyer:

Parameter1. Draft TP Scheme2. Preliminary TP Scheme3. Final TP Scheme
Authority ActionInitial zoning, road grid & proposed OP-to-FP layout publishedTPO hears landowner objections, finalizes reconstitution & F-FormTPO finalizes valuation, compensation & betterment charges
Are FP Boundaries Fixed?No — Tentative / proposed onlyYes — Physical FP shape, area & road frontage are legally frozenYes — Already frozen at Preliminary stage
Can FP Location Shift?Yes, possible during TPO hearingsNo (except rare court/govt variation orders)No
Trunk Infra RolloutEarly planning / phased laterEligible for road & utility execution (highest in TP 2A & TP 4A)Full statutory closure
Buyer Risk ProfileHigher boundary-shift risk; requires careful agreement clausesLower boundary risk; verifiable via F-Form & Sanctioned MapLowest statutory TP risk

TP1 to TP6 & 27 Sub-TPs Overview Across Dholera SIR

Dholera’s six master Town Planning Schemes (TP1–TP6) are broken down into smaller Sub-TP blocks so infrastructure and statutory approvals can advance in manageable phases. In particular, TP 2A and TP 4A—which form the 22.54 sq. km. Activation Area—reached Preliminary sanction first, enabling trunk road and utility construction.

TP SchemeSub-TP DivisionsKey Villages CoveredSanction & Readiness Profile
TP Scheme 1Sub-TPs 1A-1 to 1A-5, 1B (6 Sub-TPs)Kadipur, Ambli, Bhadiyad, GoglaPreliminary + Draft Mix
Key northern residential & institutional Sub-TPs sanctioned at Preliminary stage; remaining advancing through TPO process.
TP Scheme 2Sub-TPs 2A, 2B (and sub-sectors)Kadipur (border), Gogla, Gorasu, Mingalpur, MahadevpuraTP 2A Preliminary (Activation Core)
Houses the ABCD hub and primary Activation Area trunk infrastructure; 2B in phased progression.
TP Scheme 3Sub-TPs 3A, 3B (and sub-sectors)Gorasu, Sodhi, Sandhida, BhimtalavPhased Preliminary / Draft
Central-western industrial & mixed-use corridor progressing in phased Sub-TP stages.
TP Scheme 4Sub-TPs 4A, 4B (and sub-sectors)Bavaliyari, Hebatpur, Sangasar, PanchiTP 4A Preliminary (Activation Core)
Covers southern Activation Area and major industrial/semiconductor ecosystem; 4B in phased progression.
TP Scheme 5Sub-TPs 5A, 5B (and sub-sectors)Cher, Dholera, Khun, MundiDraft / Phased TPO Stage
Southern and eastern urban/coastal buffer belt moving through statutory TPO reconstitution.
TP Scheme 6Sub-TPs 6A, 6B (and sub-sectors)Dholera, Zankhi, Rajpur, BhangadhDraft / Phased TPO Stage
Southernmost zone planned for longer-horizon urban and logistics expansion.
Important Statutory Verification Note: Town Planning schemes move from Draft to Preliminary stage through official Gujarat Government Urban Development & Urban Housing Department (UDD) Gazette notifications. Always verify the current gazetted sanction status of your exact Sub-TP and survey number on official DSIRDA records before finalizing a transaction.

3 Practical Rules Before Buying in a Draft or Preliminary Sub-TP

Rule 1: Verify the F-Form in Preliminary Sub-TPs

If a seller claims the plot is in a Preliminary TP scheme, ask for the Redistribution & Valuation Statement (F-Form) and match the Original Plot (OP) area, net Final Plot (FP) area in sq. meters, and TP map boundaries using our step-by-step Final Plot (FP) verification guide.

Rule 2: Never Treat a Draft FP Sketch as Permanent

If a parcel sits in a Draft Sub-TP, understand that the proposed FP number, plot shape, or road width shown on a draft layout can be modified by the Town Planning Officer before Preliminary sanction. Ensure your sale agreement clearly records the underlying Revenue Survey / Block Number and 7/12 ownership title.

Rule 3: Check NA Order & GujRERA for Private Plotted Schemes

Even inside a Preliminary TP scheme, buying a small residential plot inside a private township requires valid Non-Agricultural (NA) conversion, a DSIRDA-sanctioned sub-plotting layout plan, and GujRERA registration. Run our 15-point property due diligence checklist before paying token money.

SC
Local Field & Research Note Written & Verified by Shivrajsinh Chudasama

Born and raised in Kadipur village inside Dholera SIR, Shivrajsinh Chudasama is the founder of Dholera Smart City Solutions and author of Building Bharat and Dholera 2047. He helps retail and NRI buyers verify Sub-TP sanction stages, F-Form records, and ground infrastructure readiness.

Frequently Asked Questions: Draft vs Preliminary TP in Dholera

What is the main difference between a Draft TP and Preliminary TP in Dholera SIR?
In a Draft TP scheme, Final Plot (FP) boundaries and shapes are tentative proposals that can still change during Town Planning Officer (TPO) hearings. Once a scheme receives Preliminary TP sanction, the physical Final Plot boundaries, net square-meter area, and abutting road widths are legally fixed.
Which Dholera TP schemes were sanctioned first at the Preliminary stage?
TP 2A and TP 4A—which cover the ~22.54 sq. km. Activation Area—were among the earliest Sub-TPs to achieve Preliminary sanction, enabling the construction of trunk roads, underground utilities, and the ABCD administrative complex, alongside several Phase-I Sub-TPs in TP1, TP2, TP3, and TP4.
Is it safe to buy land in a Draft TP scheme in Dholera?
Buying land in a Draft TP scheme is legally valid if the underlying 7/12 agricultural/NA title is clear, but buyers must account for a longer infrastructure timeline and the possibility that the proposed Final Plot shape or exact location may shift slightly before Preliminary TP sanction.
How many total Sub-TPs exist in Dholera SIR?
Dholera SIR’s six master Town Planning Schemes (TP1 to TP6) are divided into 27 Sub-TPs across the ~422 sq. km. developable urban area.
Verify Your Exact Sub-TP & Final Plot (FP) Before Buying

Explore our complete Town Planning and Map verification resources for Dholera SIR:

WhatsApp Call Now Contact

Quick Inquiry

Get Verified Rates & Plot Availability

Your inquiry will open directly in WhatsApp.